In 2016 PopUp House purchased its 13 000m² factory in Rousset (13), the PopUp Factory.
Every project is designed as a 3d model by our technical department and then sent out to the Factory.
The digitalisation of the process allows for a continuous control of the quality, costs and the construction schedule.
It takes 6 weeks to receive the framing materials on site. And then let the installation begin!